


TABLE OF CONTENTS
Environmental Monitoring Works
Reporting Change
Environmental Complaints and Prosecution
Future Key Issues
Background
Project Organization
Summary of the EM&A Requirements
2. OPERATIONAL
NOISE MONITORING
Monitoring Requirements
Monitoring Parameters, Frequency and
Duration
Monitoring Locations
Results and Observations
Monitoring Requirements
Monitoring Parameters, Frequency and
Duration
Monitoring Locations
Results and Observations
Monitoring Requirements
Operational Disturbance on Intertidal Bird
Communities
Bridge Lighting Scheme and Bird Collisions
Replanted Mangroves
5. SEDIMENTATION
RATE MONITORING
Monitoring Requirements
Monitoring Equipment and Methodology
Monitoring Parameters, Frequency and Duration
Monitoring Locations
Results and Observations
Site Environmental
Audit
Status of
Environmental Licensing and permitting
Implementation Status
of Environmental Mitigation Measures
Summary of Exceedances
of Environmental Quality Performance Limit
Implementation Status
of Environmental Complaint Handling Procedures
Key Issues for the Coming Month
Environmental Monitoring Programme for the
Next Month
8. CONCLUSIONS
AND RECOMMENDATIONS
Conclusion
Recommendations
List of Tables and Graphs
Table
5.1 The Proposed
Coordinates
Table
5.2 The Proposed and
Measured Coordinates in the Month
Table
5.3 Results of the
Survey in the Month
Graph
5.1 Graphical
Presentation of Sedimentation Rate
Monitoring
Table
6.1 Summary of
Environmental Notification, Licensing and Permit Status
List of Figures
Figure 1.1 Project
Organization
Figure 1.2 Layout
of Work Site
Figure 5.1 Location
of Sedimentation Rate Monitoring
List of Appendices
Appendix
A Contact
of Key Environmental Personnel
Appendix
B Action
/ Limit Levels and Event Action Plans
Appendix
C Environmental
Monitoring Schedules
Appendix
D Site
Inspection Records
Appendix
E Summary
of Environmental Mitigation Implementation Schedule
Appendix
F Complaint
Flow Diagram and Complaint Log