TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

Environmental Monitoring Works

Reporting Change

Environmental Complaints and Prosecution

Future Key Issues

1.         INTRODUCTION

Background

Project Organization

Summary of the EM&A Requirements

2.         OPERATIONAL NOISE MONITORING

Monitoring Requirements

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Results and Observations

3.         WATER QUALITY

Monitoring Requirements

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Results and Observations

4.         ECOLOGY

Monitoring Requirements

Operational Disturbance on Intertidal Bird Communities

Bridge Lighting Scheme and Bird Collisions

Replanted Mangroves

5.         SEDIMENTATION RATE MONITORING

Monitoring Requirements

Monitoring Equipment and Methodology

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Results and Observations

6.         ENVIRONMENTAL AUDIT

Site Environmental Audit

Status of Environmental Licensing and permitting

Implementation Status of Environmental Mitigation Measures

Summary of Exceedances of Environmental Quality Performance Limit

Implementation Status of Environmental Complaint Handling Procedures

7.         FUTURE KEY ISSUES

Key Issues for the Coming Month

Environmental Monitoring Programme for the Next Month

8.         CONCLUSIONS AND RECOMMENDATIONS

Conclusion

Recommendations

 

 

 

List of Tables and Graphs

 

Table 5.1           The Proposed Coordinates

Table 5.2           The Proposed and Measured Coordinates in the Month

Table 5.3           Results of the Survey in the Month

Graph 5.1          Graphical Presentation of  Sedimentation Rate Monitoring

Table 6.1           Summary of Environmental Notification, Licensing and Permit Status

 

List of Figures

 

Figure 1.1        Project Organization

Figure 1.2        Layout of Work Site

Figure 5.1        Location of Sedimentation Rate Monitoring

 

List of Appendices

 

Appendix A        Contact of Key Environmental Personnel

Appendix B       Action / Limit Levels and Event Action Plans

Appendix C       Environmental Monitoring Schedules

Appendix D       Site Inspection Records

Appendix E       Summary of Environmental Mitigation Implementation Schedule

Appendix F        Complaint Flow Diagram and Complaint Log