Note:
All Action and Limit Levels listed below are subject to EPD's approval
During
Construction Stage
Action
and Limit Levels for 1-hour and 24-hour TSP
Parameter
Location
Action Level, mg/m3
Limit Level, mg/m3
24-hour TSP
SWC-AN1
173
260
SWC-AN2
172
1-hour TSP
SWC-AN1
322
500
SWC-AN2
306
Action and Limit Levels (Leq) for Construction Noise
Time Period
Action Level
Limit Level, dB(A)
SWC-AN1
SWC-AN2
0700 – 1900 hours on normal weekdays
When one documented complaint is received from any
one of the sensitive receivers
75
75
Action and Limit Levels for Marine Water Quality Monitoring
Parameter
Action
Limit
DO, mg/L
4.2
2.0
Turbidity, NTU
50.8 and 120% of upstream control
station's turbidity at the same tide of the same day
101.5 and 130% of upstream control
station's turbidity at the same tide of the same day
SS, mg/L
50.6 and 120% of upstream control
station's SS at the same tide of the same day
86.3 and 130% of upstream control
station's SS at the same tide of the same day
Note:- During mid-ebb tide, monitoring stations W2, W4, W6, W8, W10 and W16
were the impact stations, and would be compared against Action and Limit
Levels (No upstream control station for W16).
- During mid-flood tide, monitoring stations W1, W3, W5, W7, W9 and W15
were the impact stations, and would be compared against Action and Limit
Levels (No upstream control station for W15).
- Stations W11 to W14 were intended for monitoring potential
cross-border water quality pollution and would not have any AL Levels.
Note:During mid-ebb tide, monitoring stations
W2, W4 and W6 are the impact stations, and would be compared against Limit
Levels,
During
mid-flood tides, monitoring stations W1, W3 and W5 are the impact stations,
and would be compared against Limit Levels.
Trigger and Action Levels for Bird Density
Parameters
Trigger
level
Action
level
Bird
density
(No./ha)
30%
net reduction of bird density in construction site in comparison with
baseline data in construction site from EIA filed surveys (Table 3.10 &
3.11 in Appendix 9A of the EIA Report) and the change of bird density in
control site.
50%
net reduction of bird density in construction site in comparison with
baseline data in construction site from EIA filed surveys (Table 3.10 &
3.11 in Appendix 9A of the EIA Report) and the change of bird density in
control site.
During
Operational Stage
Proposed
Criteria to be Used for Determination of Cleaning Frequency, Action
Level and Action
Parameter
Reference Criteria for Determination of Cleaning Frequency
Action Level
Action
Total suspended solids
(mg/L)
81
3 consecutive monitoring
with the same parameter (1 or more than 1 parameter) exceeded
the criteria
Increase 1 cleaning
event per week
Total organic carbon
(mg/L)
25
Chemical oxygen demand
(mg/L)
90
Nitrite and nitrate
(mg/L)
0.72
Total Kjeldahl Nitrogen
(mg/L)
6.4
Total phoshorus (mg/L)
0.95
Copper (mg/L)
0.174
Lead (mg/L)
0.31
Zinc (mg/L)
0.94
Trigger and Action levels for Bird density
Parameters
Trigger level
Action
Action Level
Action
Bird density
(No./ha)
30% net reduction of
bird density in the bridge in comparison with baseline data of
the bridge location from EIA field surveys and the change of bird
density in control site.
Increase the monitoring
frequency to weekly.
50% net reduction of
bird density in the bridge in comparison with baseline data of
the bridge location from EIA field surveys and the change of bird
density in control site.